Skip to main content

Notice Regarding Forecasted Rainfall

Northern's Operations Staff continues working around the clock to monitor, operate and respond at all hours to issues created by this forecasted rain event. District staff will monitor and manage our stormwater systems and ensure optimum operation with as minimal impact as possible. Northern's operational capabilities include multiple pumping stations and operable gates, all operating at permitted capacity. Control gates are opened in accordance with the SFWMD Permit guidelines, and stormwater pumping stations are pumping stormwater to outfalls as permitted.

Where stormwater systems are designed to discharge by gravity, Northern Staff is monitoring outfalls to ensure no blockages impede discharge. The systems are working as designed and intended.

Please ensure the road catch basins remain clear, and advise residents to drive carefully on flooded roads. Be mindful of wildlife in lakes and canals since the flooding has also displaced them. Once the significant rainfall subsides, the systems will continue to discharge at the allowable rates until the system returns to normal control elevations.

The image shows a water treatment facility with flowing water, filtration equipment, and reflections in the water.
Water control structure near Admiral's Cove on November 3, 2026